Tuesday, October 23, 2012

The work still in progress

 Primed the patches and painted around the ceiling
 I think it looks good like this- lets leave it..
 This is the former wall paper room, all the spots are patches. I know



 Notice anything different in these next few pictures?


The floor is Gone!!!!!
-Also the walls have been painted. They are not totally done yet so I will post better pic of them later.

 Ben Pulling up our kitchen floor. This one is not as easy, there is an extra sub floor that needs to be removed.
 Joe did a ton of the kitchen after Ben, then Daniel come to help. It looked very labor intensive to me..  from the side lines :)


Here we have the floors in the basement painted



There is still lots more to do, we will be working all week on painting trim and touch up and some yard clean up since the dumpster is being delivered Wednesday then leaving Friday so that only gives us 2 days to declutter the back yard. SO.. if anybody would like to come help we would just love it!!

Thanks so much for the time that our families have spent so far!- we would still be on step 1 without it

Sunday, October 21, 2012

Painting

Here are some more Pictures from the last week or so-






Every thing is covered up ready for the paint sprayer

Doors off so they can be sprayed separately

Spraying the ceiling

Notice the amount of patching.. we basically re-sheet rocked the wall with putty

 
..and we found a leak in a basement window during a rainstorm.  
 

Wednesday, October 10, 2012

Let the work begin!

So here are all the "Before" pictures. The house as it was the day we closed.



Living Room



Food splattered ALL over the house.At first we thought it was blood! But later realized it had tomato seeds. (phewwww!)

Kitchen


Hallway upstairs

guest bath


1st bedroom

2nd bedroom

laundry/garage entry

garage


Master


walk-in closet

master bath


makeshift shower over the tub

stairway that had a LOT of holes



Stairway landing. Filthy like the rest of the house
Family room downstairs


Den/office - basement

1st bedroom- basement
Closet


under stairs closet


Furnace room

Water damage in furnace room


2nd bedroom- basement




3rd bedroom basement


It's weird the things they  left behind

Desk space in 3rd bedroom


Downstairs bathroom, with poorly made shower (hence water damage in furnace room next door)


access to furnace filter from behind bathroom door (just a hole cut into the wall)


Back yard



other side of backyard

stuff left in the shed



CLEAN UP BEGINS!!
Demolition of stupid basement shower!
Furnace room side of shower (the fuzzy specs are from the debris)


garbage hauled out from the basement






Thousands of holes to patch.

I just want to say Thank You to all our family who have spent hours and hours of sweaty hard work cleaning, washing, tearing out pee carpet, puttying, fixing, and hauling out garbage this past weekend.
The progress is amazing!


I will have more pics of the work in progress soon!